Views: 265 Author: Site Editor Publish Time: 2021-08-02 Origin: Site
In the summer of 2021, it is not only necessary to solve the problem of heavy rains and difficult work, but also the sudden epidemic shrouding everyone's hearts. Faced with many difficulties, in order to ensure that the slings can reach each customer on time, the company organized personnel to carry out Produce in an orderly manner and achieve 'two hands, two guarantees' to ensure that all work is carried out in an orderly manner.
Pay close attention to prevention and control, and ensure the stability of the epidemic
In the face of 'fireworks', 'heavy rains', and 'epidemics', Futai regards these aspects of prevention and control as the most urgent tasks at present, making careful arrangements and strict implementation to ensure that all prevention and control work is effective The sequence is powerful.Carry out hidden danger investigation, check employee information, and grasp personnel flow information in a timely manner; arrange dedicated personnel to disinfect the working area, living environment, and vehicle equipment to ensure a clean environment; measure the body temperature of employees every day, and report any problems in a timely manner; and master the information through interviews The ideological, spiritual and living conditions of employees should be investigated, and ideological education should be carried out to ensure employees' emotional stability.
Pay attention to production and ensure safety
During this special period, we will focus on production safety and make every effort to ensure transportation.Convene a heart-warming meeting in a timely manner to unify employees' thoughts on the company's safety deployment requirements, forming a situation where everyone wants to be safe and everyone knows how to be safe; pay close attention to the implementation of on-site measures and the investigation of on-site hidden dangers. Each shift will be inspected by on-duty personnel, and it is found that Problems should be rectified in a timely manner; the management personnel responsibility system should be implemented, and comprehensive control of personnel and work areas should be carried out to ensure that employees work safely and perform safe work.
Figure 1 shows the flexible sling
Picture 2 shows the automatic hook removal